apt

added via import

STS-79 - 4" - Eagle Crest Emblem

STS-79 was the 17th flight of Space Shuttle Atlantis, and the 79th mission of the Space Shuttle program. The flight saw Atlantis dock with the Russian space station Mir to deliver equipment, supplies and relief personnel. A variety of scientific experiments were also conducted aboard Atlantis by her crew. It was the first shuttle mission to rendezvous with a fully assembled Mir, and the fourth rendezvous of a shuttle to the space station

STS-79 also marked the second flight of the SPACEHAB module in support of a Shuttle-Mir docking and the first flight of the SPACEHAB Double Module configuration. The forward portion of the double module housed experiments conducted by the crew before, during and after Atlantis was docked to the Russian space station. The aft portion of the double module housed the logistics equipment to be transferred to Mir, which included food, clothing, experiments, supplies, and spare equipment. The mass of the module was 4,774 kilograms (10,520 lb).

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-79 - 4" - Unknown maker

STS-79 was the 17th flight of Space Shuttle Atlantis, and the 79th mission of the Space Shuttle program. The flight saw Atlantis dock with the Russian space station Mir to deliver equipment, supplies and relief personnel. A variety of scientific experiments were also conducted aboard Atlantis by her crew. It was the first shuttle mission to rendezvous with a fully assembled Mir, and the fourth rendezvous of a shuttle to the space station

STS-79 also marked the second flight of the SPACEHAB module in support of a Shuttle-Mir docking and the first flight of the SPACEHAB Double Module configuration. The forward portion of the double module housed experiments conducted by the crew before, during and after Atlantis was docked to the Russian space station. The aft portion of the double module housed the logistics equipment to be transferred to Mir, which included food, clothing, experiments, supplies, and spare equipment. The mass of the module was 4,774 kilograms (10,520 lb).

This version of the STS-78 patch has a cut edge.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-79 - 4" - A-B Emblem (Modern)

STS-79 was the 17th flight of Space Shuttle Atlantis, and the 79th mission of the Space Shuttle program. The flight saw Atlantis dock with the Russian space station Mir to deliver equipment, supplies and relief personnel. A variety of scientific experiments were also conducted aboard Atlantis by her crew. It was the first shuttle mission to rendezvous with a fully assembled Mir, and the fourth rendezvous of a shuttle to the space station

STS-79 also marked the second flight of the SPACEHAB module in support of a Shuttle-Mir docking and the first flight of the SPACEHAB Double Module configuration. The forward portion of the double module housed experiments conducted by the crew before, during and after Atlantis was docked to the Russian space station. The aft portion of the double module housed the logistics equipment to be transferred to Mir, which included food, clothing, experiments, supplies, and spare equipment. The mass of the module was 4,774 kilograms (10,520 lb).

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-79 - 4" - A-B Emblem

STS-79 was the 17th flight of Space Shuttle Atlantis, and the 79th mission of the Space Shuttle program. The flight saw Atlantis dock with the Russian space station Mir to deliver equipment, supplies and relief personnel. A variety of scientific experiments were also conducted aboard Atlantis by her crew. It was the first shuttle mission to rendezvous with a fully assembled Mir, and the fourth rendezvous of a shuttle to the space station

STS-79 also marked the second flight of the SPACEHAB module in support of a Shuttle-Mir docking and the first flight of the SPACEHAB Double Module configuration. The forward portion of the double module housed experiments conducted by the crew before, during and after Atlantis was docked to the Russian space station. The aft portion of the double module housed the logistics equipment to be transferred to Mir, which included food, clothing, experiments, supplies, and spare equipment. The mass of the module was 4,774 kilograms (10,520 lb).

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-59 - 4" - Unknown maker

STS-59 Shuttle mission was a Space Shuttle program mission that took place in 1994. The launch was chronicled by the 1994 Discovery Channel special about the Space Shuttle Program.
Endeavour began its sixth mission on the morning of 9 April 1994 with an on-time launch at 7:05 am Eastern time. Soon after, the six astronauts began activating the sensitive radar equipment in the payload bay that would be operated around the clock during the next ten days.

By 8 pm, the Space Radar Laboratory-1 experiments of NASA's Mission to Planet Earth were all activated and began their study of the earth's ecosystem.
STS-59 ground controllers finished activating Spaceborne Imaging Radar-C (SIR-C) and began processing its first images of the earth, while engineers working with the X-Band Synthetic Aperture Radar (X-SAR) worked their way through some initial activation problems.

This patch is very similar to this alternate STS-59 patch. The stitching of the yellow star differentiates this from the Eagle Crest Emblem version which also appears similar.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-59 - 4" - Unknown maker

STS-59 Shuttle mission was a Space Shuttle program mission that took place in 1994. The launch was chronicled by the 1994 Discovery Channel special about the Space Shuttle Program.
Endeavour began its sixth mission on the morning of 9 April 1994 with an on-time launch at 7:05 am Eastern time. Soon after, the six astronauts began activating the sensitive radar equipment in the payload bay that would be operated around the clock during the next ten days.

By 8 pm, the Space Radar Laboratory-1 experiments of NASA's Mission to Planet Earth were all activated and began their study of the earth's ecosystem.
STS-59 ground controllers finished activating Spaceborne Imaging Radar-C (SIR-C) and began processing its first images of the earth, while engineers working with the X-Band Synthetic Aperture Radar (X-SAR) worked their way through some initial activation problems.

This patch is very similar to this alternate STS-59 patch. The stitching of the yellow star differentiates this from the Eagle Crest Emblem version which also appears similar.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-59 - 4" - Eagle Crest Emblem

STS-59 Shuttle mission was a Space Shuttle program mission that took place in 1994. The launch was chronicled by the 1994 Discovery Channel special about the Space Shuttle Program.
Endeavour began its sixth mission on the morning of 9 April 1994 with an on-time launch at 7:05 am Eastern time. Soon after, the six astronauts began activating the sensitive radar equipment in the payload bay that would be operated around the clock during the next ten days.

By 8 pm, the Space Radar Laboratory-1 experiments of NASA's Mission to Planet Earth were all activated and began their study of the earth's ecosystem.
STS-59 ground controllers finished activating Spaceborne Imaging Radar-C (SIR-C) and began processing its first images of the earth, while engineers working with the X-Band Synthetic Aperture Radar (X-SAR) worked their way through some initial activation problems.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-59 - 4" - A-B Emblem

STS-59 Shuttle mission was a Space Shuttle program mission that took place in 1994. The launch was chronicled by the 1994 Discovery Channel special about the Space Shuttle Program.
Endeavour began its sixth mission on the morning of 9 April 1994 with an on-time launch at 7:05 am Eastern time. Soon after, the six astronauts began activating the sensitive radar equipment in the payload bay that would be operated around the clock during the next ten days.

By 8 pm, the Space Radar Laboratory-1 experiments of NASA's Mission to Planet Earth were all activated and began their study of the earth's ecosystem.
STS-59 ground controllers finished activating Spaceborne Imaging Radar-C (SIR-C) and began processing its first images of the earth, while engineers working with the X-Band Synthetic Aperture Radar (X-SAR) worked their way through some initial activation problems.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-47 - 4" - A-B Emblem (Modern)

STS-47 was the 50th Space Shuttle mission of the program, as well as the second mission of Space Shuttle Endeavour. The mission mainly involved conducting experiments in life and material sciences.
Spacelab-J—a joint NASA and National Space Development Agency of Japan (NASDA) mission using a manned Spacelab module—conducted microgravity investigations in materials and life sciences. The international crew, consisting of the first Japanese astronaut to fly aboard the Shuttle, the first African-American woman to fly in space and, contrary to normal NASA policy, the first married couple to fly on the same space mission (Lee and Davis), was divided into red and blue teams for around the clock operations. Spacelab-J included 24 materials science and 20 life sciences experiments, of which 35 were sponsored by NASDA, 7 by NASA and 2 collaborative efforts.

 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-47 - 4" - A-B Emblem - No Stars

STS-47 was the 50th Space Shuttle mission of the program, as well as the second mission of Space Shuttle Endeavour. The mission mainly involved conducting experiments in life and material sciences.
Spacelab-J—a joint NASA and National Space Development Agency of Japan (NASDA) mission using a manned Spacelab module—conducted microgravity investigations in materials and life sciences. The international crew, consisting of the first Japanese astronaut to fly aboard the Shuttle, the first African-American woman to fly in space and, contrary to normal NASA policy, the first married couple to fly on the same space mission (Lee and Davis), was divided into red and blue teams for around the clock operations. Spacelab-J included 24 materials science and 20 life sciences experiments, of which 35 were sponsored by NASDA, 7 by NASA and 2 collaborative efforts.

I don't know if this was an intentional issue, but this A-B Emblem version of the STS-47 patch is lacking stars. 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-47 - 4" - A-B Emblem

STS-47 was the 50th Space Shuttle mission of the program, as well as the second mission of Space Shuttle Endeavour. The mission mainly involved conducting experiments in life and material sciences.
Spacelab-J—a joint NASA and National Space Development Agency of Japan (NASDA) mission using a manned Spacelab module—conducted microgravity investigations in materials and life sciences. The international crew, consisting of the first Japanese astronaut to fly aboard the Shuttle, the first African-American woman to fly in space and, contrary to normal NASA policy, the first married couple to fly on the same space mission (Lee and Davis), was divided into red and blue teams for around the clock operations. Spacelab-J included 24 materials science and 20 life sciences experiments, of which 35 were sponsored by NASDA, 7 by NASA and 2 collaborative efforts.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-37 - 4" - Swissartex

STS-37, the eighth flight of the Space Shuttle Atlantis, was a six-day mission with the primary objective of launching the Compton Gamma Ray Observatory (GRO), the second of the Great Observatories program which included the visible-spectrum Hubble Space Telescope, the Chandra X-ray Observatory and the infrared Spitzer Space Telescope. The mission also featured two spacewalks, the first since 1985.

The differentiator between makers of this patch is usually made by the way the stars are embroidered. These stars are slightly larger, but thin.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-37 - 4" - Unknown maker

STS-37, the eighth flight of the Space Shuttle Atlantis, was a six-day mission with the primary objective of launching the Compton Gamma Ray Observatory (GRO), the second of the Great Observatories program which included the visible-spectrum Hubble Space Telescope, the Chandra X-ray Observatory and the infrared Spitzer Space Telescope. The mission also featured two spacewalks, the first since 1985.

The differentiator between makers of this patch is usually made by the way the stars are embroidered. This version of the STS-37 patch has smaller stars, and curiously, a different number of stars.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-37 - 4" - Eagle Crest Emblem

STS-37, the eighth flight of the Space Shuttle Atlantis, was a six-day mission with the primary objective of launching the Compton Gamma Ray Observatory (GRO), the second of the Great Observatories program which included the visible-spectrum Hubble Space Telescope, the Chandra X-ray Observatory and the infrared Spitzer Space Telescope. The mission also featured two spacewalks, the first since 1985.

The differentiator between makers of this patch is usually made by the way the stars are embroidered. This version of the STS-37 patch has large, thick stars. 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-37 - 4" - A-B Emblem

STS-37, the eighth flight of the Space Shuttle Atlantis, was a six-day mission with the primary objective of launching the Compton Gamma Ray Observatory (GRO), the second of the Great Observatories program which included the visible-spectrum Hubble Space Telescope, the Chandra X-ray Observatory and the infrared Spitzer Space Telescope. The mission also featured two spacewalks, the first since 1985.

The differentiator between makers of this patch is usually made by the way the stars are embroidered.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-47

Launched September 12, 1992, landed September 20, 1992.

Spacelab-J -- a joint NASA and National Space Development Agency of Japan (NASDA) mission
utilizing a manned Spacelab module -- conducted microgravity investigations in materials and life
sciences.

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - apt