hobaugh

STS-129 - 4" - Unknown maker

STS-129 (ISS assembly flight ULF3) was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009 at 14:28 EST, and landed at 09:44 EST on November 27, 2009 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility.
STS-129 focused on staging spare components outside the station. The 11-day flight included three spacewalks. The payload bay carried two large ExPRESS Logistics Carriers holding two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly, a spare latching end effector for the station's robotic arm, a spare trailing umbilical system for the Mobile Transporter, and a high-pressure gas tank. STS-129 was the first flight of an ExPRESS Logistics Carrier. The completion of this mission left six space shuttle flights remaining until the end of the Space Shuttle program, after STS-135 was approved in February 2011.

For STS-129 the sun shines brightly on the International Space Station (ISS) above and the United States below representing the bright future of U.S. human spaceflight. The contiguous U.S., Rocky Mountains, and Great Desert Southwest are clearly visible on the earth below encompassing all the NASA centers and the homes of the many dedicated people that work to make our Space Program possible. The integrated shapes of the patch signifying the two Express Logistics Carriers that will be delivered by STS-129 providing valuable equipment ensuring the longevity of the ISS. The Space Shuttle is vividly silhouetted by the sun highlighting how brightly the Orbiters have performed as a workhorse for the U.S. Space Program over the past 3 decades. The Space Shuttle ascends on the Astronaut symbol portrayed by the Red, White and Blue swoosh bounded by the gold halo. This symbol is worn with pride by this U.S. crew representing their country on STS-129. The names of the crew members are denoted on the outer band of the patch. As STS-129 launches, the Space Shuttle is in its twilight years. This fact is juxtaposed by the 13 stars on the patch which are symbolic of our children who are the future. The Moon and Mars feature predominantly to represent just how close humankind is to reaching further exploration of those heavenly bodies and how the current Space Shuttle and ISS missions are laying the essential ground work for those future endeavors.

This version of the STS-129 patch has a merrowed edge, gold solar panels and has more elaborate stars.

Size: 
5" / 128mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-129 - 4" - A-B Emblem

STS-129 (ISS assembly flight ULF3) was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009 at 14:28 EST, and landed at 09:44 EST on November 27, 2009 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility.
STS-129 focused on staging spare components outside the station. The 11-day flight included three spacewalks. The payload bay carried two large ExPRESS Logistics Carriers holding two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly, a spare latching end effector for the station's robotic arm, a spare trailing umbilical system for the Mobile Transporter, and a high-pressure gas tank. STS-129 was the first flight of an ExPRESS Logistics Carrier. The completion of this mission left six space shuttle flights remaining until the end of the Space Shuttle program, after STS-135 was approved in February 2011.

For STS-129 the sun shines brightly on the International Space Station (ISS) above and the United States below representing the bright future of U.S. human spaceflight. The contiguous U.S., Rocky Mountains, and Great Desert Southwest are clearly visible on the earth below encompassing all the NASA centers and the homes of the many dedicated people that work to make our Space Program possible. The integrated shapes of the patch signifying the two Express Logistics Carriers that will be delivered by STS-129 providing valuable equipment ensuring the longevity of the ISS. The Space Shuttle is vividly silhouetted by the sun highlighting how brightly the Orbiters have performed as a workhorse for the U.S. Space Program over the past 3 decades. The Space Shuttle ascends on the Astronaut symbol portrayed by the Red, White and Blue swoosh bounded by the gold halo. This symbol is worn with pride by this U.S. crew representing their country on STS-129. The names of the crew members are denoted on the outer band of the patch. As STS-129 launches, the Space Shuttle is in its twilight years. This fact is juxtaposed by the 13 stars on the patch which are symbolic of our children who are the future. The Moon and Mars feature predominantly to represent just how close humankind is to reaching further exploration of those heavenly bodies and how the current Space Shuttle and ISS missions are laying the essential ground work for those future endeavors.

This patch features a cut edge.

Size: 
5" / 128mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-118 - 4" - "Anderson" - Unknown maker

STS-118 was a space shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 successfully lifted off on 8 August 2007 from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on 21 August 2007.
It was the first flight of Endeavour since the STS-113 mission in November 2002, which was the last successful Space Shuttle flight before the loss of Columbia on STS-107. STS-118 pilot Charles Hobaugh had been the entry team CAPCOM for STS-107. Had Columbia not disintegrated, it would have been chosen for this mission,[4] which would have been its 29th mission, and probably its only mission to the ISS.
The mission is also referred to as ISS-13A.1 by the ISS program. The mission added two more components to the ISS as well as bringing supplies for its crew.

When Clayton Anderson was moved to STS-117 Drew was selected for the available position on STS-118. Randy Hunt produced versions with Anderson's name prior to the crew swap. A-B Emblem also has an STS-118 version with Anderson's name. This version was made by the same maker of the "Drew" version of this patch.

 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-118 - 4" - A-B Emblem "Anderson"

STS-118 was a space shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 successfully lifted off on 8 August 2007 from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on 21 August 2007.
It was the first flight of Endeavour since the STS-113 mission in November 2002, which was the last successful Space Shuttle flight before the loss of Columbia on STS-107. STS-118 pilot Charles Hobaugh had been the entry team CAPCOM for STS-107. Had Columbia not disintegrated, it would have been chosen for this mission,[4] which would have been its 29th mission, and probably its only mission to the ISS.
The mission is also referred to as ISS-13A.1 by the ISS program. The mission added two more components to the ISS as well as bringing supplies for its crew.

When Clayton Anderson was moved to STS-117 Drew was selected for the available position on STS-118. A-B Emblem released a limited number of versions with Anderson's name prior to the crew swap.

 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-118 - 4" - Unknown maker

STS-118 was a space shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 successfully lifted off on 8 August 2007 from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on 21 August 2007.
It was the first flight of Endeavour since the STS-113 mission in November 2002, which was the last successful Space Shuttle flight before the loss of Columbia on STS-107. STS-118 pilot Charles Hobaugh had been the entry team CAPCOM for STS-107. Had Columbia not disintegrated, it would have been chosen for this mission,[4] which would have been its 29th mission, and probably its only mission to the ISS.
The mission is also referred to as ISS-13A.1 by the ISS program. The mission added two more components to the ISS as well as bringing supplies for its crew.

This STS-118 patch is virtually identical to the A-B Emblem version, however the red lettering is slightly thicker and the "Drew" is slightly higher with relation to the ISS. This maker of this patch also made a version with "Anderson"

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-118 - 4" - A-B Emblem

STS-118 was a space shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 successfully lifted off on 8 August 2007 from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on 21 August 2007.
It was the first flight of Endeavour since the STS-113 mission in November 2002, which was the last successful Space Shuttle flight before the loss of Columbia on STS-107. STS-118 pilot Charles Hobaugh had been the entry team CAPCOM for STS-107. Had Columbia not disintegrated, it would have been chosen for this mission,[4] which would have been its 29th mission, and probably its only mission to the ISS.
The mission is also referred to as ISS-13A.1 by the ISS program. The mission added two more components to the ISS as well as bringing supplies for its crew.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-104 - 4"- A-B Emblem

STS-104 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. Its primary objectives were to install the Quest Joint Airlock and help perform maintenance on the International Space Station. It was successful and returned to Earth without incident, after a successful docking, equipment installation and three spacewalks.
The primary purpose of the flight was to deliver and install the Quest airlock. The Joint Airlock is a pressurized flight element consisting of two cylindrical chambers attached end-to-end by a connecting bulkhead and hatch. Once installed and activated, the ISS airlock became the primary path for International Space Station space walk entry and departure for U.S. spacesuits, which are known as Extravehicular Mobility Units, or EMUs. In addition, the Joint Airlock is designed to support the Russian Orlan spacesuit for EVA activity.

 This patch depicts the launch of Space Shuttle Atlantis and the successful completion of the mission objectives as signified by the view of the ISS with the airlock installed. The astronaut symbol is displayed behind Atlantis as a tribute to the many crews that have flown before. The hard work, dedication, and teamwork of the airlock team is represented by the ISS components inside the payload bay which include the Joint Airlock and four high pressure gas tanks containing nitrogen and oxygen. In the words of a STS-104 crew spokesperson, "The stars and stripes background is symbolic of the commitment of a nation to this challenging international endeavor and to our children who represent its future." The NASA insignia design for Shuttle flights is reserved for use by the astronauts and for other official use as the NASA Administrator may authorize. Public availability has been approved only in the form of illustrations by the various news media. When and if there is any change in this policy, which is not anticipated, it will be publicly announced.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - hobaugh